Kapeka Water Supply And Sanitation Facility Project Phase 2
Construction of Water Supply & Sanitation system:
Supply and install duty and standby pumps 2No. 45kW surface water (raw water pumps), 2No. 30kW surface water pumps (Clean water pumps), 2No. 11kW surface water pumps (Backwash pumps).
Supply and install 2No. 75kW Air Blowers.
Supply and install Soft-Start controller for Air Blowers, Raw water pumps, Clean water pumps and Backwash pumps.
Supply and install 800A main distribution board.
Supply and install 315KVA three phase transformer
Supply and install 90m3 steel water tank, erected on 12m galvanised steel tank tower.
Supply and install associated plumbing fittings and accessories.